(416) 562-2555 info@sulyrenovation.ca Serving Toronto & the GTA — Free, no-obligation estimates

Maple Home Renovations for Houses Ready for Their First Big Refresh

New floors, rebuilt stairs, updated bathrooms and fresh paint for Maple houses from the 1990s and 2000s that still have their original finishes.

Several streets in Maple carry aircraft names because they were built on the former Maple Airport, where homebuilding began in 1993, and by about 2000 subdivisions had spread toward Highway 400 and Teston Road. So much of Maple went up in one burst, and houses from that stretch are now old enough that carpet, stair coverings and first-generation bathrooms tend to wear out at roughly the same time.

The wear pattern of a 1990s subdivision house

Beyond the original village crossroads at Keele Street and Major Mackenzie Drive, many streets were filled by production builders within a few seasons of each other. Neighbouring houses often share more than a floor plan; they share a wear pattern too. In a typical Maple home from that era we find:

  • Wall-to-wall carpet in bedrooms and on the stairs, flattened along the traffic paths, sometimes over a subfloor that squeaks
  • Carpeted stairs with an oak handrail and pickets that no longer suit the rest of the house
  • Main-floor ceramic tile cracked where the floor flexes, or sheet vinyl lifting at the seams
  • Ensuites built around a corner soaker tub, a separate acrylic shower stall and a basic vanity, with grout and caulking that have worn thin
  • Builder-flat paint, nail pops in the drywall and scuffed walls along the stairwell

None of it is urgent on its own. Tackled together, though, the work can be sequenced so each trade finishes cleanly against the next, instead of new flooring being cut up for a bathroom a year later.

The old village itself is the exception. Houses around the crossroads may sit inside the Maple Heritage Conservation District, where the city's heritage review concerns exterior changes such as windows, porches or siding, rather than the floors, stairs and bathrooms described on this page. The City runs the same kind of review in its districts in Kleinburg and Woodbridge.

Carpet off the floors, hardwood on the stairs

Taking out carpet is usually the most visible change. Before anything new goes down, we screw down loose subflooring to quiet the squeaks, then check the height at every transition, especially where a new hardwood or vinyl plank floor meets existing kitchen tile. Stairs can often keep their structure: carpeted treads are replaced with hardwood treads and risers, and the old oak pickets can be swapped for metal spindles or painted balusters. Matching the stair nosing to the new floor is what makes the two look like they were built together.

Ensuites with room to spare

Many Maple ensuites from the late 1990s were given plenty of floor area, which opens up options. A common choice is to remove the corner tub and build a larger walk-in shower with a glass panel, or keep a freestanding tub and gain space for a double vanity. Tile goes over a proper membrane, and any change to drain or supply locations is handled by the qualified trades that part requires. An ensuite on this scale is typically a two-to-four-week job.

Paint after the dust, with the family still at home

Painting comes after the dusty work, never before. Drywall repairs, nail pops and old anchor holes are filled and sanded, and patches are primed so they do not flash through. The stairwell is painted last of all, after the new treads are in and the scuffs from carrying materials up and down have stopped.

Owners can usually stay in their Maple house while all this happens. We work one zone at a time, keep at least one bathroom and the kitchen usable, and cover finished floors as the trades move through, so a phased refresh does not mean months of living in a construction site.

Local Know-How in Maple

Carpet out, hard floors in

Subfloors screwed down to stop squeaks, transitions planned against existing tile, and hardwood, engineered or vinyl plank flooring installed room by room with furniture moved as we go.

Stairs that match the floor

Carpeted stairs converted to hardwood treads and risers, with new pickets or balusters and stair nosings matched to the flooring on each landing.

Ensuites past their first life

Worn grout, thin caulking and a dated acrylic stall replaced with a tiled walk-in shower and a new vanity, making use of the generous floor area many late-1990s ensuites were given.

Areas We Cover in and Around Maple

  • Maple village core
  • Eagle Hills
  • Thornberry Woods
  • Peace Village
  • Teston
  • Sherwood
Services in Maple

Renovation Services for Maple Properties

Quieter Hardwood Floors for Maple Bedrooms and Upper Halls

Pull the carpet out of the bedrooms and upper hall of a 1990s Maple two-storey and the house gets louder. Footsteps the pad used to soak up now carry through the subfloor into the kitchen and family room below, where the ceiling is usually drywall fixed to the joists with no insulation between them. We deal with it from above: an underlayment with a published impact-sound rating goes under engineered or vinyl plank, and solid hardwood is nailed over a sound-reducing mat where the manufacturer approves one. Pinning a floating floor at the edges or butting it tight to the walls lets noise and movement through, so we keep the expansion gap and cover it with the new baseboard. Felt pads and a hall runner do the rest.

Read more about flooring installation

Bathroom Renovations in Maple, Beyond the Ensuite

The ensuite gets the attention, but the two-storey houses on the former airport lands, and on the streets that spread west from 1995, usually have two more rooms due for work. The shared upstairs bathroom often has a tub inside a one-piece acrylic surround; a tiled tub enclosure over a waterproofing membrane keeps a bathtub for young children and gives the room a proper finish. The main-floor powder room tends to sit by the laundry and the garage entry, and a family setting up a ground-floor bedroom for an older relative may want it turned into a three-piece bath with a low-threshold shower. That depends on the floor space and on a licensed plumber finding a drain route, so we measure both rooms together.

Read more about bathroom renovations

Maple Kitchen Renovations Built Around a New Island

In Maple's 1990s and 2000s two-storeys the kitchen usually opens onto the family room already, often with a breakfast table by the patio door. When owners renovate, that table is what most often gives way to an island with seating, and the island then decides the rest of the plan: the width of the walkways, where the stools tuck in and whether the sink moves into it. An island sink or dishwasher needs a drain carried through the floor, simple over an unfinished basement but a ceiling cut in a finished one, so we look downstairs before the island's position is settled. The licensed plumber runs that drain and an electrician adds the island's outlets; the cabinets, counters and backsplash are ours.

Read more about kitchen renovations

General Contractor in Maple for Village, 1960s and 1980s Houses

The 1990s streets are only part of Maple. Around the crossroads sits the core of what became a police village in 1882; the southwest has small subdivisions from the 1960s, a decade that also saw homes replaced after an August 1962 explosion and fire at a propane depot; and the first large subdivisions arrived in the northwest during the 1980s. Each group starts a renovation from a different place. In a village house, old plaster and flooring are tested before anything is torn out, and a licensed electrician traces whatever early wiring remains; a 1960s house often wants its outside walls properly insulated for the first time; and a 1980s two-storey usually begins with its closed kitchen and formal rooms. Permits for all three come from the City of Vaughan.

Read more about general renovations

Maple Basement Renovations Near the GO Station

Maple has its own GO station on the Barrie line, with Rutherford one stop south, and that matters to anyone planning a basement unit. Vaughan's zoning allows up to two extra dwelling units on many lots, both inside a detached, semi-detached or townhouse home or one inside and one in an accessory building, and each added unit generally needs its own parking space unless the lot lies within a protected major transit station area. Owners near either station should check whether their lot falls inside one. Where neither the station nor the driveway helps, the basement can still be finished as rooms for the household itself, which takes a permit but no extra parking space.

Read more about basement finishing

Painters in Maple for Stained Oak Trim and Kitchen Cabinets

Maple's 1980s subdivisions and the first streets on the old airport lands both went up in years when stained oak was a common choice for door casings, baseboards, railings and kitchen cabinets. Oak can be painted, but not with a quick coat over the varnish. The surface is degreased and scuff-sanded, a bonding primer goes on, and the open grain of red oak will still show through the colour unless it is filled first, a texture some owners like and others do not. Cabinet doors and drawer fronts come off and are finished separately from the boxes, which are painted in place. Before a whole kitchen is committed, we prepare a sample door so you can judge the grain, sheen and colour in your own light.

Read more about interior & exterior painting

Maple Fireplace Surrounds Re-Faced in Porcelain Tile

Many family rooms in Maple's 1990s two-storeys were built around a gas fireplace framed in marble or ceramic, and once the carpet is gone that surround is often the most dated thing left. Re-facing it with large porcelain panels starts with a licensed gas technician shutting off and checking the insert; we then keep to the heat clearances its manufacturer sets and build out the wall so the new face either sits flush with the mantel or stands proud as one clean slab. Panels that size need flat cement board behind them. The hearth takes the same porcelain, cut so its veining runs on from the wall, and a television above the mantel goes up only where the insert's heat limits allow.

Read more about tile installation

Also Available in Maple

Recent Projects Near Maple

View All Projects
Local Questions

Renovating in Maple: Your Questions Answered

In most houses of this age, yes. The carpet and pad come off, the existing stringers stay, and new hardwood treads and risers are fitted over the structure, or the old treads are replaced one by one. Pickets and the handrail can be kept, refinished or replaced. We look at the stair first to confirm the structure is solid and to measure how the new nosings will meet each landing.

For many households the corner tub gets little use and takes up the most useful corner of the room. Replacing it with a larger walk-in shower, or with a smaller freestanding tub plus a shower, usually makes the space work harder. Moving a drain needs the proper trade and sometimes opening the ceiling below, so we plan that before choosing tile. From demolition to the last bead of caulk, the room is usually back in use in two to four weeks.

Usually the cause is underneath. Ceramic tile needs a stiff base, and cracks that run in a line tend to point to a floor that flexes or a subfloor too thin for tile. We lift a section to see how it was built, then stiffen the subfloor and add a crack-isolation membrane before new tile goes down. If the joists themselves look undersized or damaged, that needs a proper structural assessment before any finish work goes in.

Serving All of Maple

Ready When You Are

Let’s Bring Your Renovation Plans to Life

Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.

Call Now Free Estimate