(416) 562-2555 info@sulyrenovation.ca Serving Toronto & the GTA — Free, no-obligation estimates

Burlington Home Renovations That Bring 1960s and 70s Houses Up to Date

Brant Hills split-levels, Tyandaga two-storeys and Roseland character houses all get the same careful approach to kitchens, floors and paint.

Many Burlington houses were built while the city was growing quickly in the 1960s and 1970s, and plenty still have their original floor plan: a closed kitchen, a formal living room that rarely gets used, and sometimes carpet laid over the first hardwood. Updating them is satisfying work, because the bones are usually sound and the improvement shows the moment you walk in.

Brant Hills, Tyandaga, Millcroft and Roseland

Burlington grew quickly in the post-war decades, and much of the urban area south of Dundas Street and Highway 407 filled in over that period. Much of Brant Hills dates from the 1970s, with two-storey houses alongside bungalows and split-levels. Tyandaga, built around the City's public golf course, was developed from the early 1970s into the 1990s. Millcroft came later, with its first homes going up in the mid-1980s around a golf course and larger executive houses following over the next decade and more. Aldershot in the west end and Roseland, laid out near the lake in the 1920s on garden-suburb lines, mix older character houses with later infill and rebuilds.

Burlington houses from the 1960s and 1970s tend to share a familiar list of tired items: original or first-replacement kitchens, narrow doorways between rooms, dated trim, and floors worn unevenly by decades of foot traffic. None of that is a reason to move, and most of it can be fixed without touching the structure.

Opening up a Burlington main floor from the 1970s

For owners of these homes, the usual goal is a main floor that works the way people live now. Every house is different, but a typical update might include:

  • Removing or widening the partition that boxes in the kitchen, once we know whether it carries load
  • A new kitchen with a more practical layout, usually three to six weeks of work
  • New flooring run continuously through the main level, replacing a patchwork of carpet, sheet vinyl and tile
  • Patching walls and ceilings wherever partitions have moved or openings have changed
  • A full repaint, including trim, doors and closets

A load-bearing partition can often still be opened, but only once a structural designer has specified the beam and the City has issued a permit for the work. Preparing that design is outside our work; our part is helping you bring in the right professional early and then building exactly what they specify.

Not every project needs walls to move. A dated house can often feel far fresher with new flooring and a complete repaint, in much less time than a full renovation. In a split-level, the work can usually go one level at a time, so part of the house stays in normal use while the rest is closed off.

Downtown, the lake and the countryside to the north

Near downtown and along Lakeshore Road, a lot of the houses are older and carry the marks of earlier owners' projects, so we allow for floors that dip and walls that lean a little. Past repairs are not always what they seem, and we open things up carefully before committing to a finish plan.

North of Dundas Street and Highway 407, Burlington changes character completely. That land lies within the Greenbelt, much of it also governed by Niagara Escarpment Plan rules, and it is home to rural properties around communities such as Kilbride, Lowville and Mount Nemo. Properties there can come with extra planning rules, so for anything beyond interior work we suggest checking with the City and the Escarpment Commission before designs are final. We visit rural Burlington homes in person before pricing, so your estimate reflects the house itself rather than photos.

Local Know-How in Burlington

Main floors reworked for today

Closed kitchens, little-used formal rooms and awkward dining areas are reorganized into a layout that suits how your household actually spends its evenings.

Floors and paint in one pass

Continuous new flooring and a full repaint, planned together, so the whole level looks finished rather than half updated and pieced together over several years.

Permit questions answered up front

Whether a job needs a City permit, Conservation Halton's sign-off or a word with heritage staff is settled before the estimate is final, not discovered after demolition.

Areas We Cover in and Around Burlington

  • Roseland
  • Aldershot
  • Tyandaga
  • Brant Hills
  • Millcroft
  • Downtown Burlington
  • Headon Forest
  • The Orchard
  • Alton Village
  • Palmer
  • Shoreacres
  • Mountainside
Services in Burlington

Renovation Services for Burlington Properties

Burlington Renovation Contractor for Creek Valley and Lakeshore Lots

Below the escarpment, short creeks run south across Burlington to Lake Ontario, and in the west Grindstone Creek winds through Aldershot to Hamilton Harbour. Plenty of lots back onto one of those valleys or onto the lake itself, and the rear of such a lot often lies inside the area Conservation Halton regulates for flooding and erosion. There, a new deck, an addition, a retaining wall or a change in grade usually needs the authority's permission as well as the City's permit, applied for separately. Before a plan reaches outdoors on one of these lots, we look up the Conservation Halton mapping with you, and during the job we keep stockpiles and the bin well back from the slope.

Read more about general renovations

Burlington Kitchen Renovations, Same Footprint or a New Layout

In a Brant Hills or Tyandaga kitchen, keeping the sink, dishwasher and range in place is the simplest route: new cabinets, counters, backsplash and floor on the plumbing already there. Moving the sink to an island means new drain and vent piping under the floor, which a licensed plumber installs under a permit. Swapping a gas range for induction can outgrow a panel sized in the 1970s. A gas fitter caps the old line, and a licensed electrical contractor files the notification with the Electrical Safety Authority and, if the service has to grow, applies to Burlington Hydro, whose engineering staff lay out the upgrade. Where old vinyl tile turns up under a newer floor, we have it tested before anyone lifts it, as Health Canada advises for pre-1990 materials.

Read more about kitchen renovations

Burlington Flooring for Owners Planning to Age in Place

Burlington's population skews older than the country's: the 2016 census put its median age at 43.3, against 41.2 nationally. For owners choosing floors for the years ahead rather than for resale, the brief changes. We favour a matte, slip-resistant finish over high gloss, flush thresholds instead of raised reducers between rooms, and one continuous surface so that loose rugs are no longer needed. Carpeted stairs can be replaced with solid treads and a nosing in a contrasting tone that is easy to see. In bedrooms, a cushioned vinyl plank or cork is gentler underfoot than ceramic, and quieter too.

Read more about flooring installation

Burlington Basement Finishing Planned Around Flood Prevention

Halton Region's Basement Flooding Prevention Subsidy Program pays toward a backwater valve fitted inside the house, disconnecting downspouts or a reverse-grade driveway drain, relining a damaged private sewer lateral, and moving the weeping tile off the sewer to a new sump pump. Homes built from the mid-1950s to the late 1970s, a span that takes in much of Brant Hills, can also get a Household Drainage Survey if they have flooded before and sit in a Region priority area. A licensed plumber installs the valve and sump under a City of Burlington permit, before any finishing. The Region's pipe ends at the property line; the rest is yours. Then we frame, insulate and finish around them, and the basement itself usually takes four to eight weeks.

Read more about basement finishing

Bathroom Renovations in Burlington, With or Without a Permit

The City lists replacing plumbing fixtures with the same type, in the same location, among the work that needs no building permit. So a bathroom that keeps its toilet, tub and vanity in place can get new tile and fixtures with fewer steps up front. Adding a bathroom is a different job. Where a 1970s two-storey has no washroom on the main floor, a powder room under the stairs or beside the front hall needs new drain and vent lines, run by a licensed plumber under a permit, and a fan ducted outside. We time tile and drywall around the inspection and, while the studs are bare, add blocking where grab bars may go later. A main bath generally takes two to four weeks to rebuild.

Read more about bathroom renovations

Burlington Painting for Heritage Streets and Stained Oak Trim

In March 2026 Council approved the plan and guidelines for the Burlington Avenue and Ontario Street Heritage Conservation District, so exterior work on the older houses along those streets near downtown is now expected to follow the district's guidelines. Before we repaint porches, wood siding, doors or trim there, we ask you to email the City's heritage staff, who confirm whether a heritage permit applies; the same check suits individually designated houses elsewhere on the Municipal Cultural Heritage Register. Indoors, the common request is different: stained oak or pine trim and doors from the 1970s and 80s brought to a painted finish. That means de-glossing, a bonding primer and caulked joints, plus grain filler if you want the oak to look smooth.

Read more about interior & exterior painting

Framing Garage Conversions and Coach Houses in Burlington

Burlington permits one, two or three additional residential units on a lot where the zoning allows: inside the house, attached to it, or in a detached coach house or similar accessory building. The first unit needs no extra parking space. For owners eyeing the garage, the City publishes a Garage Conversion Toolkit with sample one- and two-bedroom layouts and an accessible option. Those are concepts only, so a designer still draws your plans, which pass the City's Pre-Building Approval step before the building permit is issued. Our part is the framing: a level, insulated floor built up over the sloping slab, the overhead door opening closed in with a stud wall and window, and partitions for the bedroom and bathroom.

Read more about framing

Also Available in Burlington

Recent Projects Near Burlington

View All Projects
Local Questions

Renovating in Burlington: Your Questions Answered

Quite a lot. Common choices are a home office, a den with built-in shelving, a playroom, or a larger dining area if the current one is cramped. Adding a door or a short partition for privacy is simple framing and drywall work. New flooring and paint finish the change, and most of these conversions leave the rest of the house untouched while the work is under way.

It could. Some Ontario houses built from the mid-1960s through the 1970s were wired with aluminum branch circuits while copper was expensive. The wire itself is not the usual problem; the connections at outlets, switches and fixtures are, and they need devices rated for aluminum or short copper pigtails. Some insurers also ask about it. A licensed electrician can usually tell at the panel, and any repairs are theirs to make. We plan the drywall patching and paint around that work, ideally before new finishes go on.

It can. Rural Burlington is Greenbelt countryside, and on land where the Escarpment Plan applies, exterior changes and additions may first require Niagara Escarpment Commission approval, and only then a building permit. Work confined to the inside of the house tends to be more straightforward. Confirm the requirements with the City and the Commission early, and we will schedule our work around their answers.

For many sellers it is a sensible middle ground between doing nothing and a full renovation. Neutral paint and new floors make rooms read as cared for, and the work is quick compared with kitchens or bathrooms. Because each room is priced on its own line, you can decide which ones matter most to buyers and leave the rest.

Serving All of Burlington

Ready When You Are

Let’s Bring Your Renovation Plans to Life

Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.

Call Now Free Estimate