Space is usually the first thing East York homeowners ask us to find. Many of its small brick bungalows went up in the years around the Second World War, when a modest house on a modest lot suited a young family well. They share the former borough with the solid brick homes of Leaside and the apartment towers of Thorncliffe Park, and in all three the extra room has to come from inside walls that are already there.
Finding space in a small bungalow
Topham Park is a good illustration: most of its houses were built between 1944 and 1946 by a federal Crown corporation for returning veterans, and similar modest homes fill streets across the former borough. A typical East York bungalow has two or three bedrooms, one bathroom and a kitchen separated from the living room by a wall with a doorway. On a modest lot there is rarely room to build out, so the gains have to come from inside. The changes that make the most difference tend to be:
- Removing or widening the kitchen wall so the kitchen, dining and living areas share light
- Full-height cabinetry and a pantry wall that use every bit of vertical space
- Built-in closets and storage under the stairs or in awkward corners
- Pocket or sliding doors where a swinging door wastes floor area
- Lighter flooring and paint carried through the whole main floor
If the kitchen wall turns out to carry the ceiling, an engineer's beam and a permit come before our demolition crew does. The same questions come up north of the old borough line, where our North York page picks up the post-war bungalows. We plan the schedule so the kitchen, normally a three-to-six-week job, is out of service for as short a stretch as possible.
Low basement ceilings
Many East York basements were never meant to be living space, and headroom gets tight once ducts and beams are counted. We make the most of what is there: keeping ceilings as high as possible with careful bulkhead layout, using slim insulated wall assemblies, and picking flooring that adds little height. When there simply is not enough headroom for the room you want, lowering the floor is a structural job for underpinning specialists, and we say so plainly rather than build around a problem. In East York houses of this age the basement stairs are often steep and narrow too, so when a basement is being finished we check whether a safer, more comfortable stair layout will fit.
Apartment units for property managers
Thorncliffe Park, planned in the 1950s as one of Toronto's first high-rise neighbourhoods, and the towers of Crescent Town together hold a large number of rental suites, most of them built decades ago. For property managers and owners in East York, we renovate units between tenancies or as part of a planned upgrade program: kitchens, bathrooms, flooring, drywall and paint, finished to a consistent standard so suites stay easy to maintain. Work runs to each building's own rules, and common hallways are kept clean for the residents living on the same floor.
Leaside homes and the one-bathroom problem
Leaside was planned in detail long before most of it was built, and the bulk of the housing stock is from the early 1930s to the late 1940s, many of them solid brick two-storey homes, detached or semi. Families who love these homes often run into the same limit: a single bathroom upstairs for everyone. We renovate that bathroom with durable tile and better storage, then look for room for a second one, such as a powder room tucked beneath the staircase, or an ensuite carved from a large closet, with a plumber handling the supply and drain lines. The bathroom work itself usually wraps up in two to four weeks.